| General
Plan Process
The
“General
Plan Process Overview” graphic provides an overview of the
entire General Plan process in terms of time, community input
and key documents.
The green arrow shows the 18 month General Plan update process
in time. The blue bubbles and blue arrows show community involvement. |
Please
note the General Plan Steering Committee meeting starts in what
would roughly be September 2005 and ends in about May 2006. The
Website and Press Release blue arrow starts in September and continues
through the end of the process. The blue bubbles are approximately
placed in reference to time. The orange boxes represent key documents
which will make up the General Plan.
Also note
the Background Report was prepared from April through June. Also,
note the arrow from the Background Report goes to and from the “Visioning
& Key Principals” box. This means data from the Background/Existing
Conditions Report will be used as a baseline for the Visioning and
Key Principals Report while the outcome of the Visioning and Key
Principals report will be incorporated back into the Background
report. By the same token, the arrow from the Preferred Plan means
the Preferred Plan will be presented at the Family Open House Workshop.
Feedback from the Family Open House will update the Preferred Plan.
|
|
|
|
 |

A number of the forms and publications within the site are supplied in Adobe
Acrobat PDF format. Click on the icon above to download the latest Adobe Reader
for your Browser.
Para solicitar
información sobre el Plan General de Duarte en español,
llame por favor a Silvia Hurtado al 626)357-7931 ext. 239.
o por correo electronico
a gp@accessduarte.com
|


|